Small main slider(Vi)

Piling work of Ha Noi beer factory - Me Linh - Vinh Phuc

Project: Ha Noi beer factory - Phase 2

Employer: HABECO

Main contractor: LILAMA Hà Nội

Quantity: Pile driving of D500mm: 5000m, D600mm: 30.000m, D700mm: 2000m

Amount: VND 3.914.000.000

Location: Mê Linh - Hà Nội

Period: 7/2007- 2/2009