Project: Ha Noi beer factory - Phase 2
Employer: HABECOMain contractor: LILAMA Hà NộiQuantity: Pile driving of D500mm: 5000m, D600mm: 30.000m, D700mm: 2000mAmount: VND 3.914.000.000
Location: Mê Linh - Hà Nội
Period: 7/2007- 2/2009