Piling work of Thang Long cement plant - Hoanh Bo - Quang Ninh

Project: Thang Long cement plant
Location: Lê Lợi commune – Hoành Bồ – Quảng Ninh.
Quantity: 
- Bored pile in soil D1200: 2271,8m
- Bored pile in stone D1200:163,8m
- Bored pile in soil D1000: 2246,4m
- Bored pile in stone D1000: 274
- Bored pile in soil D800: 375,1
- Bored pile in stone D800: 22
- Pile driving D40x40: 529.9md
- Pile drivingD30x30: 212.8md
Employer: Thang Long cement JSC
Period: 2005 - 2006