Small main slider

Piling work of Vinhomes Riverside - Long Bien - Ha Noi

Project: Vinhomes Riverside
Location: Phúc Lợi, Phúc Đồng, Việt Hưng and Gia Thụy- Long Biên- Hà Nội

Employer: Công ty cổ phần PCM

Quantity: Casting, pressing 250x250mm: 23.500m

               Casting, pressing D350A, D400A: 60.000m

               Pile driving RC pile 400x400mm: 17.000m

Amount:  17,997,634,750 VNĐ 

Period: 3-5/2011