Small main slider

Bored pile of Vinh Thinh bridge - Son Tay

Project: Vinh Thinh bridge

Location: 2C national highway - Sơn Tây

Main contractor: Hoa Binh petro investent & construction JSC(PVC5) and Hong Ha construction Co. Ld

Work item: Bored pile D1500

Quantity: Bored pile D1500: 3.800m (From pier 20 to 30 and from pier 71to 79)

Amount: VND 15.000.000.000

Period: 5/2012 - 10/2012