Small main slider

Phuc Son cement factory - Hai Duong

Project: Phuc Son cement factory

Phase 1: 2003

Work item: Pile driving work D600: 30,000m; 400x400mm: 24,000m

Bored pile: D800 10,000m

Amount : 22,000,000,000

Phase 2: 2006

- Bored pile of Silô Clinker D800 in soil: 7.924 md

- Bored pile of Silô Clinker D800 in stone: 446 md

- Construction of cement conveyor 

- Pile driving of RC pile 400x400mm: 1.816 md

Amount: VND 7.500.000.000.